The Precincts, Canterbury Cathedral
17/01/2023Altira Park, Herne Bay
06/09/2016
Client:
JD Geerings Plumbing & Heating LtdContractor:
JD Geerings Plumbing & Heating LtdArchitect:
Waterstone DesignProject Value:
£110k
Project Overview
Electrical Installation Works of 14 New Build Residential Apartments.
We kept within tight budget constraints, despite the project taking over 18 months from initial enquiry to securing the contract.
Project Description
A new build development: We had several meetings with the client to look at areas that could be value engineered to keep under their tight budget. The contract package changed multiple times, including the layout of roof, which meant the PV element had to be redesigned and the route of the main submain that powered the building was changed halfway through the install.
Throughout the project we were flexible to last minute changes, accommodated the redesigns and found cost savings at each stage, ensuring costs remained within the initial budget.
Project Works Detail
Distribution
Lighting Installation
Power Installation
Smoke Detection Installation
BT Installation
TV Installation
Electric Heating
Mechanical Supply/Connection
External Lighting
Fire Alarm and AOV
Telecom Installation
Door Entry System
IRS TV System, Including SKY Q
Solar Panel Installation
Mains Cupboard Design and Installation
Earthing and Bonding
Electrical Testing, including Building Control Certification
Comprehensive O & M