The Foundry

The Bread Factory
13/06/2016
Jennison Building
13/06/2016


		

Project Overview

New build 2 office fit-out

Project Description

Design and Build Fit out, emphasis on the 1st floor architectural look hanging pendants were in installed

Project Works Detail

  • Main & secondary containment
  • Preparation of the electrical design
  • Lighting luminaires and lighting controls
  • External lighting
  • Small power
  • Air-conditioning supplies
  • Fire Detection
  • Cat 6 structured cabling
  • Telephone lines
  • CCTV system
  • Disabled alarm systems
  • Earthing and bonding
  • Testing and commissioning
  • Final record drawings